Design to installation
Seven stages, and you are never the project manager.
A kitchen is the room a household cannot do without while it is being built, which is why the order of operations matters here more than anywhere else in the house. This is how an Omni project actually runs, from the first free conversation to the phone call two years later.

01
The first consultation
Free, no obligation, and not about products.
Some people arrive with a folder of saved images and a fixed idea. Others arrive with a kitchen they have simply stopped liking and no vocabulary for why. Both are fine starting points, and the first meeting treats them the same way: we talk about who uses the room and when, what currently annoys you about it, and what would have to change for you to stop thinking about it.
It can happen at your house or at the showroom. It costs nothing and commits you to nothing — and by the end of it you will have an honest early view on whether what you have in mind is possible in that space, and roughly what kind of project it is.
02
Design & costings
The paid stage, and the one that prevents the expensive surprises.
This is where the room is measured properly and drawn to scale: dimensions and squareness, ceiling height, window and door swings, where the services currently run and where they could go, and what the floor and the structure will take. The design and costings stage runs from £250 to £500 depending on the scope of the project, with £60 added if a site visit is required.
We publish that figure because the alternative — a free design paid for invisibly inside the price of the units — is how people end up unable to compare two quotations. You are buying a measured drawing, the 3D imaging and a costed specification, and you know exactly what it costs before you say yes.
03
CAD & 3D imaging
You walk round the finished room on screen.
Our in-house CAD imaging system produces a computer representation of your concept — not a photograph of somebody else’s kitchen, but yours: your window, your ceiling height, your worktop run. Layout options are drawn to scale, and door style, worktop, handles and lighting are dropped in and viewed from the angles you will actually stand at.
The point is not the picture. The point is that the decisions get made while they are still free to change. An island that eats the walkway, a full-height run that darkens the corner, a handle that fights the door style: all obvious in a render, all expensive to discover with the floor already down.
04
Second consultation & quotation
One meeting, one set of drawings, one written figure.
The second consultation happens in the showroom, where you can put a hand on the finishes while looking at the 3D images of your own room. Everything is listed: cabinetry, worktop, appliances, the scope of the building work and the programme for it, and you leave with a written quotation and invoice rather than a number somebody said out loud.
This is also the moment to mention the Harpenden Rugby Football Club offer if it applies to you — members get £150 off a cabinetry order, and we donate a further £150 to the club. It is not applied automatically, so it is worth saying.
05
Manufacture & delivery
Allow a minimum of six to eight weeks, and use them.
Once the order goes in, the cabinetry is sourced and manufactured to your drawing, which takes a minimum of six to eight weeks to delivery. Appliances, stone and any made-to-order items have their own lead times, and they are checked against that programme rather than assumed.
This is the least dramatic stage and the one that decides whether a project runs on time. Kitchens that overrun have almost always overrun at the ordering desk rather than on site — which is why the start date is set after the lead times are confirmed, not before.
06
The building work and the fit
Where designs and dreams turn into a reality.
Any structural work, the first fix, the plastering and the flooring happen in sequence, then the cabinetry goes in, then worktops are templated and fitted, then the second fix, the splashbacks, the electrics and the decoration. It is our own team of local tradesmen, the same faces job after job, working to the drawing you signed off.
We are a family firm that has renovated several houses while living in them, so we know what it is to make a cup of tea in a room with no worktop. The programme is sequenced around the household where it can be, and keeping the disruption to a minimum is a stated aim rather than a hope.
07
Handover, and afterwards
The room handed back working — and a mobile number that still answers.
Everything is run and checked, the room is cleaned, and you are shown how it all works, including the things people otherwise discover by accident — which isolator does what, how the soft-close hinges adjust, what the worktop wants in its first fortnight. The care guide on this site covers the rest.
Then the part clients tend to write about: you ring the person who designed the room. One reviewer describes the whole thing being project-managed to the point where all they had to do was describe the vision. That only works if the same person is still there at the end, which in a two-man family firm they are.
Two things we will not do
Price it over the phone
A figure given before the room has been measured is a guess, and a guess revised upwards mid-job is how people come to dislike their builder. You get the number after the design is agreed — which is the only point at which a number means anything.
Start before the design is signed
Decisions taken with a wall already open are taken under pressure and cost more. Everything that can be settled at the drawing stage gets settled at the drawing stage. That is what the 3D work is for.
Start with a conversation, not a quotation.
Ring Stephen on the number below, or email a few photographs of the room with rough measurements. The first consultation is free and commits you to nothing — and you will know quickly whether what you have in mind will work in that space.
Office hours are Monday to Friday, 9am to 5pm — but the phone is a mobile, so evening and weekend calls about a live job get answered anyway.